Product Detail :
|
Geo-technical studies, soil investigation, finalisation & preparation of general arrangement drawing, preparation of structural design and drawings etc. for foundation, substructure and superstructure etc. & also expected b.o.q of road over bridges proper and its approaches in liue of l.c. gate no. 44, 55, 60, 79c/e, 81b/t, 82 b/t, 84c/e, 86 spl/e, 87c/e, 88c/e, 92b/t, 93b/t, 99a/e, 102b/t & 103b/t (15nos.) in between block section skg to rbh from km 94/23-25 to 119/31-120/0 & 126/1-3/23-25 to 155/1-5 in howrah & division eastern railway.
|