|
Product Detail :
|
Construction of Foundation, Substructure and Superstructure of Important Bridge No. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m OPEN WEB GIRDER Spans, including Pile Foundation and 800 m Approaches, for Single-Line Railway Track conforming to RDSO 25 T Axle Load Standard and Substructure designed for 32.5 T Loading over River Barakar between Barakar and Kumardubi Stations from Km 229/30 to Km 230/16 (F/HWH), of Eastern Railway
|
| Tender Detail : |
Construction of Foundation, Substructure and Superstructure of Important Bridge
no. 18 Comprising 4 X 30.5 M + 3 X 45.70 M + 2 X 30.50 M + 2 X 45.70 M + 4 X
30.50 M Open Web Girder Spans, Including Pile Foundation and 800 M
approaches, for Single-line Railway Track Conforming to Rdso 25 T Axle Load
standard and Substructure Designed for 32.5 T Loading Over River Barakar
between Barakar and Kumardubi Stations From Km 229/30 to Km 230/16 (f/hwh),
of Eastern Railway |