Product Detail :
|
OHE and PSI Works in Connection with Modification of Line No. 4 & 6 to Facilitate Full Rake Loading in Both the Line of Roxy and Up Gradation of Siding Track for Suitable of 25 T Axle Load of S.e. Railway in CKP Division. Provision of 70 Nos. Auxiliary Transformer for Automatic Block Signaling System with Modification of Existing Electrical Installation and Augmentation of Data Logger in Asb-tata and Rksn-rou Section of CKP Division.
|