|
Product Detail :
|
Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7 -S = 39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB) SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing & dismantling of existing Phase-I Fence etc. from BP No - 812/1-S to 816/1-S=4.702 Km, BP No.- 817/4-S to 825/5-S =6.181 Km, BP No. 826/2 -S to 829/MP = 2.800 Km & BP No. 830/5 -S to 830/7 -S = 0.300 Km, Total Length= (4.702 + 6.181 + 2.800 + 0.300) = 13.983 Km (Package-III). Mild steel circular hollow section posts, welded mesh panels, straining Y-arms, intermediate Y-arms, SS 304 razor wire, concertina coil fencing.
|
| Tender Detail : |
Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7 -S = 39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB) SH: Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing & dismantling of existing Phase-I Fence etc. from BP No - 812/1-S to 816/1-S=4.702 Km, BP No.- 817/4-S to 825/5-S =6.181 Km, BP No. 826/2 -S to 829/MP = 2.800 Km & BP No. 830/5 -S to 830/7 -S = 0.300 Km, Total Length= (4.702 + 6.181 + 2.800 + 0.300) = 13.983 Km (Package-III). |