|
Product Detail :
|
WBIW/CTU/CE(S)/e-NIT-40(e)/ 2025-26 SL01 Anti Erosion work from Ch. 19.80 Km to Ch.-21.00 Km for a length of 1200 M along the Right Bank of River Saptamukhi at Mouza Iswaripur, within Block Namkhana, PS Kakdwip, Dist South 24 Parganas
|
| Tender Detail : |
WBIW/CTU/CE(S)/e-NIT-40(e)/ 2025-26 SL01 #*. Anti Erosion work from Ch. 19.80 Km to Ch.-21.00 Km for a length of 1200 M along the Right Bank of River Saptamukhi at Mouza Iswaripur, within Block Namkhana, PS Kakdwip, Dist South 24 Parganas |